Test Light 36 Inch Long Lead 6V / 12V Plastic / Steel Black / Yellow Each Allstar Performance

Skip to product information
1 of 1

Allstar Performance

SKU:ALL76215

Regular price $6.89
Regular price Sale price $6.89
Sale Sold out
Shipping calculated at checkout.
Quantity
View full details

Quickly diagnose electrical problems by testing for current in electrical circuits, relays, switches or fuses. Handheld test light has a 36 Inch lead wire with an insulated clip which fastens to a common ground and a sharp piercing point to probe insulated wire or terminals. Indicator light illuminates identifying powered circuits in 6-12V systems.

Details:

  • Color: Black/Yellow
  • Overall Length: 36 Inch Lead
  • Volts: 6 Volts, 12 Volts
  • Material: Plastic, Steel
  • Sold As: Each
CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov